Alfa Marushima Tokyo Japan

News

Heritage Provides Exploration Update on New Millennium Prospect

(TheNewswire)

NOT INTENDED FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

VANCOUVER, BC TheNewswire – March 24, 2025 Heritage Mining Ltd. (CSE: HML FRA:Y66) (” Heritage ” or the ” Company “) is pleased to announce that samples have been submitted on Saturday March 22, 2025 from the New Millennium 2025 diamond drill program targeting two mineralized vein systems in the immediate vicinity of the highest grade grab sample on the  property (2,330 gt Au) within its flagship exploration project Drayton Black Lake (” DBL “) (Figure 2 and 3). The Company anticipates recommencing drilling on Zone 3 Extension Prospect in short order.

New Millenium Target Historical Highlights:

  • The Company’s 2025 diamond drill program drilled under historical trenches which had results up to 5.18oz/ton Au and 4.8oz/ton Au, +1,000g/t Ag, 0.37% Cu, %0.078 Mo, +1%Pb, 0.68%Zn

  • The Company has confirmed these findings at surface in prior work programs returning up to 2,330 g/t Au (grab) in the immediate vicinity of the above-mentioned trenches tracing over 300m at surface

  • Multi-elemental analysis from prior channel sampling programs supports positive correlation between Au and Te, Ag, Cu, Pb, Zn. When combined with visual inspection of core, shows similarities to mineralization at Zone 3, an intrusion related gold mineralization system identified in 2024 comparable to Hammond Reef style mineralization.

New Millennium Target Highlights (Press Release: February 27, 2025)

  • Total 556m in nine holes completed vs planned 370m over seven holes. Additional meterage was driven from favorable mineralization intersection. All samples are delivered to the lab as at Saturday March 22, 2025.

  • Drill holes show multiple occurrences (up to 51.40m core length) of variably mineralized shear zone material, local granitic/felsic intrusions, and massive to semi massive quartz veins (Figure 1) in seven of the nine holes drilled.

  • The presence of chalcopyrite with pyrite in chlorite-carbonate alteration with patchy k-feldspar alteration in quartz veins and wall-rock is reminiscent of some of the best Au-bearing intercepts at the nearby Zone 3 Prospect that were drilled in 2024 (September 20, 2024 Press Release).


Click Image To View Full Size

Figure 1: HML025-006 Select photograph showing variably mineralized shear zone material hosting semi massive fine grade pyrite filling laminations within massive to semi massive quartz veins associated with k-feldspar altered granite.

“The historical significance of the recently acquired (100% owned) New Millennium target area is very impressive and important to mention as we look forward to assay results. Our systematic exploration approach has successfully intersected significant mineralized core lengths, which is an interesting twist compared to the historically observed high-grade but narrow veins at surface.

It seems to widen at depth, which is a very good sign, considering we have only drilled up to 87m.

We are also looking forward to drilling Zone 3 (DBL Project) and the Rognon Mine are (Contact Bay Project), both of which are high potential drill target areas.

For some time now, we have secured a controlling position on our projects within one of the last underexplored greenstone belts with fantastic access in Northern Ontario. I would like to thank the technical team for their contributions to a successful 2025 drill program thus far, and I look forward to the assay results, continued drilling, and our growth together.” Commented Peter Schloo, President, CEO and Director of Heritage


Click Image To View Full Size

Figure 2: DBL Total Property Outline


Click Image To View Full Size

Figure 3: DBL Project: Reduced-to-Pole Magnetic Intensity over Bedrock Geology

Qualified Person

Mitch Lavery P. Geo, Strategic Advisor for the Company, serves as a qualified person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects and has reviewed the scientific and technical information in this news release, approving the disclosure herein.

ABOUT HERITAGE MINING LTD.

The Company is a Canadian mineral exploration company advancing its two high grade gold-silver-copper projects in Northwestern Ontario. The Drayton-Black Lake and the Contact Bay projects are located near Sioux Lookout in the underexplored Eagle-Wabigoon-Manitou Greenstone Belt . Both projects benefit from a wealth of historic data, excellent site access and logistical support from the local community. The Company is well capitalized, with a tight capital structure.

For further information, please contact:

Heritage Mining Ltd.

Peter Schloo, CPA, CA, CFA

President, CEO and Director

Phone: (905) 505-0918

Email: peter@heritagemining.ca

FORWARD-LOOKING STATEMENTS

This news release contains certain statements that constitute forward looking information within the meaning of applicable securities laws. These statements relate to future events of the Company. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “seek”, “anticipate”, “plan”, “continue”, “estimate”, “expect”, “forecast”, “may”, “will”, “project”, “predict”, “potential”, “targeting”, “intend”, “could”, “might”, “should”, “believe”, “outlook” and similar expressions are not statements of historical fact and may be forward looking information. All statements, other than statements of historical fact, included herein are forward-looking statements.

Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such risks include, among others, the inherent risk of the mining industry; adverse economic and market developments; the risk that the Company will not be successful in completing additional acquisitions; risks relating to the estimation of mineral resources; the possibility that the Company’s estimated burn rate may be higher than anticipated; risks of unexpected cost increases; risks of labour shortages; risks relating to exploration and development activities; risks relating to future prices of mineral resources; risks related to work site accidents, risks related to geological uncertainties and variations; risks related to government and community support of the Company’s projects; risks related to global pandemics and other risks related to the mining industry. The Company believes that the expectations reflected in such forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward‐looking information should not be unduly relied upon. These statements speak only as of the date of this news release. The Company does not intend, and does not assume any obligation, to update any forward‐looking information except as required by law.

This document does not constitute an offer to sell, or a solicitation of an offer to buy, securities of the Company in Canada, the United States, or any other jurisdiction. Any such offer to sell or solicitation of an offer to buy the securities described herein will be made only pursuant to subscription documentation between the Company and prospective purchasers. Any such offering will be made in reliance upon exemptions from the prospectus and registration requirements under applicable securities laws, pursuant to a subscription agreement to be entered into by the Company and prospective investors.

Copyright (c) 2025 TheNewswire – All rights reserved.

News Provided by TheNewsWire via QuoteMedia

Blue Lagoon Resources Strengthens Mining Committee

(TheNewswire)

March 24, 2025 TheNewswire – Vancouver, British Columbia Blue Lagoon Resources Inc. (the “Company”) (CSE: BLLG; FSE: 7BL; OTCQB: BLAGF) is pleased to announce the addition of Peter Bojtos, P.Eng to its recently formed Mining Committee that is tasked with successfully guiding the Company’s transition from an exploration-focused company to a near-term gold and silver producer at its 100%-owned Dome Mountain Gold Project in British Columbia.

Mr. Bojtos is a Professional Engineer with over 50 years of worldwide experience in the mining industry.

Over his career he has visited and evaluated properties in nearly 80 countries and has been involved with operations in 30 of them. He has carried out more than 15 significant corporate acquisitions, mergers or sales that involved 24 operating mines and he was the regional exploration manager at Kerr Addison at the time of the staking and subsequent discovery of what eventually became Inmet’s Troilus gold-copper mine in Quebec. Mr. Bojtos has participated in the financing, development, building or reopening of

19 mines and has had a hand in the operation of 24 producing mines.

Mr. Bojtos graduated from the University of Leicester, England in 1972, following which he worked at open-pit iron-ore and underground base-metal and uranium mines in West Africa, the United States and Canada. Then for 12 years he worked in Toronto for Kerr Addison Mines Ltd., a Noranda Group company, in increasingly senior management and officer positions. From 1990 to 1992 he was the President & CEO of RFC Resource Finance Corp. restarting a zinc mine in Washington State. From 1992 to 1993 Mr. Bojtos was the President & CEO of Consolidated Nevada Goldfields Corp. that operated precious metal mines in the United States. From 1993 to 1995 he was Chairman & CEO of Greenstone Resources Ltd, acquiring, constructing and operating several gold mines in Central America.

For the past 26 years Mr. Bojtos has been an independent director of numerous Canadian, US, Australian, London or European listed mining and exploration companies including Birim Goldfields Inc., Desert Sun Mining Corp., Queenstake Resources Ltd., European Uranium Inc., US Gold Corp., Vaaldiam Resources Ltd. and William Resources Inc. and is currently the Chairman of the Board of Avino Silver & Gold Mines Ltd. He was also the President of Pembridge Resources plc which acquired and restarted the Minto copper

mine in Yukon.

“As we transition Blue Lagoon Resources from an exploration company to a near-term producer, assembling a team of proven industry leaders is critical to our success,” said Rana Vig President and CEO of Blue Lagoon Resources. “Peter’s extensive experience in mine development, financing, and operations makes him an invaluable addition to our Mining Committee. His deep understanding of what it takes to bring mines into production and maintain profitable operations, will provide us with strategic guidance as we focus on responsibly and efficiently advancing the Dome Mountain Gold Project . We are excited to welcome Peter to the team and look forward to his contributions as we move into this next chapter of growth,” he added.

A Strong Foundation for Growth

The Mining Committee has been strategically assembled to provide technical guidance, operational oversight, and strategic planning expertise as Blue Lagoon moves forward towards production. While Dome Mountain remains a highly prospective district-scale property with 15 known high-grade gold veins and less than 10% of the land package explored , the Company’s primary focus is on safely, responsibly and efficiently mining its fully permitted deposit while self-funding future exploration and resource expansion .

With the addition of Mr. Bojtos and further strategic appointments that will be announced in the coming weeks, Blue Lagoon Resources is well-positioned to accelerate its transition to gold and silver production and build shareholder value.

Any production decision in advance of obtaining a feasibility study of mineral reserves demonstrating economic and technical viability of the project is associated with increased uncertainty and risk of failure .

About Blue Lagoon Resources Inc.

Blue Lagoon Resources is a Canadian based publicly listed mining company (CSE: BLLG; FSE: 7BL; OTCQB: BLAGF) focused on building shareholder value through the aggressive development of its 100% owned Dome Mountain Gold project. The Company is run by professionals with significant finance and mining experience and operates within a prime mining jurisdiction in British Columbia, Canada. With the granting of a full mining permit, a key milestone achieved in February 2025 – one of only nine such permits issued in British Columbia since 2015 – Blue Lagoon is now focused on last preparatory activities and tasks related to the safe and secure opening of the Dome Mountain Gold Mine, targeting Q3 2025 as the start of gold production . The Company’s primary objective has always been to become a cash-flowing mining company, to ultimately deliver tangible monetary value to shareholders, state, and local communities.

For further information, please contact:

Rana Vig

President and Chief Executive Officer

Telephone:  604-218-4766

Email: ranavig@bluelagoonresources.com

The CSE has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Statement Regarding Forward-Looking Information: This release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts, that address events or developments that Blue Lagoon Resources Inc. (the “Company”) expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “targets”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential”, “mine”, “production” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include results of exploration activities may not show quality and quantity necessary for further exploration or future exploitation of minerals deposits, volatility of gold and silver prices, delays in mine development activities, future cash flow expectations and continued availability of capital and financing, permitting and other approvals, and general economic, market or business conditions.  Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward- looking statements are based on the beliefs, estimates and opinions of the Company’s management, contractors and consultants on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management’s, contractor’s and consultants’ beliefs, estimates or opinions, or other factors, should change.

Copyright (c) 2025 TheNewswire – All rights reserved.

News Provided by TheNewsWire via QuoteMedia

The White House introduces Immediate and Vigorous Measures to fast track the Domestic Mining Industry and Production

(TheNewswire)

TORONTOTheNewswire – March 2 4 2025 – Noble Mineral Exploration Inc. (” Noble ” or the ” Company “) (TSXV: NOB) (OTCQB: NLPXF) is pleased to report that t he White House announced immediate measures to be introduced to significantly increase the US production of lithium, nickel, copper, and rare earths, with an eye to increased production, the creation of jobs and, significantly, the reduction of US reliance on foreign nations.

The aim of the United States is to take immediate action to facilitate domestic mineral production to the maximum extent possible.

Heads of related Agencies, including Defense, Energy and Agriculture, are to be charged to facilitate domestic mineral production in the United States, providing loans, capital and technical assistance and working capital and to facilitate commercially viable domestic mineral production project to the maximum possible extent.

The link to the Executive Order is https://www.whitehouse.gov/presidential-actions/2025/03/immediate-measures-to-increase-american-mineral-production/

Homeland Nickel Inc. (SHL.V : SRCGF) is in a unique position in the US, its Oregon project has the potential to become one of the only suppliers of domestic Nickel in the country.

Homeland Nickel Inc., is poised to enter the US critical minerals market with a project which would qualify for all the Government DOD, DOE and IRA subsidies currently available.

A total of 30 EV battery plants are either planned, under construction or operational in North America. Of these, 3 plants are located within 500 miles in the adjoining States of Nevada and California. This is not to mention the global demand for stainless steel. As a consequence, Homeland is currently looking at acquiring additional other advanced Nickel-Copper properties in this region.

Noble Mineral Exploration inc. currently holds ~19,500,000 shares and 750,000 2-yr warrants of Homeland Nickel Inc.

Vance White CEO of Noble Mineral Exploration said: “As a very large shareholder of Homeland Nickel we are pleased that this may fast track the ability to carry out our proposed programs on the Red Flats and Cleopatra projects in Oregon where we have a potentially very large resource of nickel ore very close to surface. This could get very exciting!”

About Noble Mineral Exploration Inc.

Noble Mineral Exploration Inc. is a Canadian-based junior exploration company, which has holdings of securities in Canada Nickel Company Inc., Homeland Nickel Inc., East Timmins Nickel Inc.(20%), and its interest in the Holdsworth gold exploration property in the area of Wawa, Ontario.

Noble holds mineral and/or exploration rights in ~70,000ha in Northern Ontario, ~14,000ha elsewhere in Quebec and Newfoundland, upon which it plans to generate option/joint venture exploration programs .

Noble holds mineral rights and/or exploration rights in ~18,000 hectares in the Timmins-Cochrane areas of Northern Ontario known as Project 81, ~2,215 hectares in Thomas Twp/Timmins, as well as an additional 20% interest in ~38,700 hectares in the Timmins area and ~175 hectares of mining claims in Central Newfoundland. Project 81 hosts diversified drill-ready gold, nickel-cobalt and base metal exploration targets at various stages of exploration. Noble also holds ~4,600 hectares in the Nagagami Carbonatite Complex and its ~3,200 hectares in the Boulder Project both near Hearst, Ontario, as well as ~3,700 hectares in the Buckingham Graphite Property, ~10,152 hectares in the Havre St Pierre  Nickel, Copper, PGM property, and ~1,573 hectares in the Cere-Villebon Nickel, Copper, PGM property, ~569 hectare Uranium/Rare Earth property (Chateau) and a ~461 hectare Uranium/Molybdenum property (Taser North),  all of which are in the province of Quebec.

Noble’s common shares trade on the TSX Venture Exchange under the symbol “NOB.”

More detailed information on Noble is available on the website at www.noblemineralexploration.com .

About Canada Nickel Company

Canada Nickel Company Inc. is advancing the next generation of nickel-sulphide projects to deliver nickel required to feed the high growth electric vehicle and stainless-steel markets . Canada Nickel Company has applied in multiple jurisdictions to trademark the terms NetZero Nickel TM , NetZero Cobalt TM , NetZero Iron TM and is pursuing the development of processes to allow the production of net zero carbon nickel, cobalt, and iron products. Canada Nickel provides investors with leverage to nickel in low political risk jurisdictions. Canada Nickel is currently anchored by its 100% owned flagship Crawford Nickel-Cobalt Sulphide Project in the heart of the prolific Timmins-Cochrane mining camp. Canada Nickel’s common shares trade on the TSX Venture Exchange under the symbol “CNC”.

For more information, please visit www.canadanickel.com.

Cautionary Statement Concerning Forward-Looking Statements

The foregoing information may contain forward-looking statements relating to the future performance of Noble Mineral Exploration Inc. Forward-looking statements, specifically those concerning future performance, are subject to certain risks and uncertainties, and actual results may differ materially from the Company’s plans and expectations. These plans, expectations, risks, and uncertainties are detailed herein and from time to time in the filings made by the Company with the TSX Venture Exchange and securities regulators. Noble Mineral Exploration Inc. does not assume any obligation to update or revise its forward-looking statements, whether as a result of new information, future events or otherwise.

Contacts:

H. Vance White, President

Phone:        416-214-2250

Fax:        416-367-1954

Email: info@noblemineralexploration.com

Investor Relations

Email: ir@noblemineralexploration.com

Copyright (c) 2025 TheNewswire – All rights reserved.

News Provided by TheNewsWire via QuoteMedia

Abcourt Announces a Non-Brokered Private Placement for Up to $3.0 Million

NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

Abcourt Mines Inc. (“Abcourt” or the “Corporation”) (TSX Venture: ABI) is pleased to announce a non-brokered private placement of a combination of a maximum of 60,000,000 units of the Corporation (each, a ” Unit “) at a price of $0.05 per Unit and a maximum of 50,000,000 common shares of the Corporation that qualify as “flow-through shares” within the meaning of subsection 66(15) of the Income Tax Act (Canada) and section 359.1 of the Taxation Act (Québec) (each, a ” FT Share “) at a price of $0.06 per FT Share, for aggregate gross proceeds of up to $3,000,000 (the ” Private Placement “).

It is expected that the proceeds from the Private Placement will be used to advance activities for development and exploration at the Sleeping Giant and Flordin gold projects in the Abitibi Greenstone belt of Quebec.

Each Unit will consist of one common share of the Corporation (a ” Common Share “) and one common share purchase warrant (a ” Warrant “). Each Warrant will entitle its holder to purchase one Common Share at a price of $0.08 for a period of 36 months following the closing date of the Private Placement (the ” Closing Date “).

In the event that, during the period ranging between 12 months and 36 months following the Closing Date, the volume-weighted average trading price of the Common Shares exceeds $0.12 per Common Share for any period of 20 consecutive trading days, the Corporation may, at its option, following such 20-day period, accelerate the expiry date of the Warrants by delivery of notice to the registered holders (an ” Acceleration Notice “) thereof and issuing a press release (a ” Warrant Acceleration Press Release “), and, in such case, the expiry date of the Warrants shall be deemed to be 5:00 p.m. (Montreal time) on the 30 th day following the later of (i) the date on which the Acceleration Notice is sent to Warrant holders, and (ii) the date of issuance of the Warrant Acceleration Press Release.

The Private Placement is expected to close on or about April 3, 2025 and remains subject to final approval of the TSX Venture Exchange (the ” TSXV “).

All securities issued in connection with the Private Placement will be subject to a restricted period ending on the date that is four months plus one day following the date of their issuance.

The securities offered have not been registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from the registration requirements. This news release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any State in which such offer, solicitation or sale would be unlawful.

ABOUT Abcourt Mines Inc.

Abcourt Mines Inc. is a Canadian exploration corporation with strategically located properties in northwestern Québec, Canada. Abcourt owns the Sleeping Giant mill and mine where it concentrates its activities.

For further information, please visit our website at www.abcourt.ca and consult our filings under Abcourt’s profile on www.sedarplus.com , or contact:

Pascal Hamelin
President and CEO
T: (819) 768-2857
E: phamelin@abcourt.com
Dany Cenac Robert, Investor Relations
Reseau ProMarket Inc.,
T: (514) 722-2276, post 456
E: dany.cenac-robert@reseaupromarket.com

Cautionary Statement on Forward-Looking Information

This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Such forward-looking information includes, but is not limited to, statements concerning the Corporation’s expectations with respect to the completion of the Private Placement on the terms set out above; the use of the available funds following completion of the Private Placement; and expectations with respect to other activities, events or developments that the Corporation expects or anticipates will or may occur in the future. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, delays in obtaining or failures to obtain required approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; other risks involved in the mineral exploration and development industry; and those risks set out in the Corporation’s public documents filed on SEDAR+ at www.sedarplus.com. Although the Corporation believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Corporation disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

Primary Logo

News Provided by GlobeNewswire via QuoteMedia